I was very pleased to see that Beiseker Public Works arranged to have the bridge over the drainage canal between downtown Beiseker and Beacon Heights repaired!
The rebuild reinforced the handrails, and provided proper entrance ramps on each side. I think it dramatically improved the look of the bridge, too! I'm hoping that we can find the funds in our tight budget to rebuild the third bridge, down by the Public Works Yard.
No comments:
Post a Comment