Showing posts with label roads. Show all posts
Showing posts with label roads. Show all posts

Tuesday, February 21, 2017

Future of First Avenue

Beiseker village council has been pondering over what to do about the "back road" into the village.   The back road is an extension of First Avenue, south past the Public Works yard, and connecting with Range Road 261 after leaving the Village limits and entering Rocky View County.  The county's section of the road connects with Highway 9 south of the Village.

This road is a pothole breeding ground!  We've spent lots of money patching and re-patching that short stretch of road, running from the bridge to the CN rail tracks.  The County paved their portion of the road south of the railway tracks, but the village can't afford to do that.

It has been suggested that we remove the battered and pothole-ridden pavement and return the road to a gravel road.  I'm concerned about the dust blowing into town from a graveled road, but this may be our only option going forward.  Environmental concerns and rules prevent us from using many dust proofing products that we may have in the past.

We already have a dust problem along the extension of the Beacon Heights Road, south past the Grasslands entry.  Almost half of the complaints I receive are about the potholes on the back road and the dust along Beacon Heights Road.  It has been a hot topic at Town Hall meetings, too!

Quite frankly, I don't have a solution to the problem.  The back road is one of many entrances to the village.  Maybe we can live with one dusty one!

Thursday, September 22, 2016

Fourth Avenue and Main Street!

We're finally seeing some action on our streets and sidewalks program.  Here's what's happening;

Fourth Avenue:  

While repairing a water main break last winter, we found some very old water pipes under Fourth Avenue between Main Street and Fifth Street.  They even found a connection to the CN Station which was demolished nearly forty years ago! 

Council decided to have the road completely dug up, all the old pipes replaced with new material, new fill placed and packed, then paved.  That project is very close to being completed once the paving crews arrive to pave that section. 

When the paving crews are here, they will also pave the areas left by crews repairing other water main breaks around town.

Main Street Sidewalks: 

Our sidewalk replacement program has been ongoing all summer and we have many blocks of shiny new sidewalks to show for it.  We were holding off on the Main Street section of sidewalks in hopes that the provincial government would renew their grant program which paid for the upgrades to Main Street between First Avenue and Second Avenue. 

Such was not the case.  The MSI Grants (Municipal Sustainability Initiatives) continue to be reduced, every year.  We decided that we couldn't wait any longer! 

The worst sections of the Main Street sidewalks are being replaced right now.  Other renovations, including the replacement of the rest of the sidewalks between Second Avenue and Third Avenue on Main Street will have to wait, until Beiseker has enough funds to pay for them!

Overall, I would like to thank all of you for your patience and understanding during these two construction projects.  And I would also like to thank all the drivers for avoiding those areas now prepared to be patch-paved.  Those areas should be paved along with Fourth Avenue in the coming days.

Sunday, July 10, 2016

Pothole Victory and Stampede Breakfast!

On behalf of the Village of Beiseker, I declare at least a partial victory over our potholes!  A shout-out goes to Public Works foreman Dave and his crew for their work!

I know some of you will say, "what about that one in front of my place?"  Please report any wayward potholes to the village office (403 947 3774) so Public Works can check it out. 

I hope I'll see all of you at Beiseker's first annual Stampede Breakfast!  It goes this Thursday on Main Street between First and Second Avenues, in front of the Arcadia Cafe!  Pancakes will be served from 9:00 a.m. until 11:00 a.m.  Come on down and meet your neighbors and members of our business community!

Monday, July 20, 2015

First Avenue Railway Crossing

photo by Mathieu Tremblay, via Flickr
Many of you have expressed concern over the condition of the railway crossing on First Ave.,past the Public Works Compound.

The crossing itself was upgraded a while back but the pavement leading up to it on both sides had to be removed.  The railway has informed us that they will soon have a crew in the area to repair and repave those small sections of road at all of those crossing upgrades.  They haven't given us a timeline for that to happen, but right now it's pretty bad there!

The Village Office will contact CN Rail today and tell them of our concerns.

As for the rest of that road from the Public Works Compound to that CNR crossing, council is examining our options.  Totally rebuilding that road would be cost prohibitive.  It has been suggested that we simply close that road and rely on our other entrances and exits into town.

I think both of those options are out of the question.  There must be a way to resurface that road without it costing the village much of its street repairs budget.  The pipeline company has agreed to help out where their crossing is.

If you have an opinion or a suggestion, contact the Beiseker Village Office at 403-947-3774.

Friday, May 29, 2015

Potholes!

The streets of our village have been plagued with potholes and frost boils every spring, but this year it's particularly bad!  Thank you to those who have informed me and the Village Office about many of the problem areas. 

Frost boils are caused by too much water under the roadway, making the surface layers very soft.  We can either barricade them off and let them firm up as the water table goes down, or we can dig up the area, put in new material and pack it well.  Obviously the first choice is the cheapest.  Each soft frost boil area will be assessed and dealt with over the next few weeks.

Potholes are caused by somewhat similar circumstances but usually affect the top layers in a small area.  I think I've been informed about every pothole within the village limits.  Some have been filled with a sand, gravel and tar mix called "cold mix," while others will have to wait until our streets are swept clean during the first week of June. 

After the streets are swept the remaining potholes will be repaired.  One of the areas of big concern is at the corner of North Road and First Avenue.  That area will be attended to during that first week of June. 

If you see another pothole or frost boil which seems to have missed our scrutiny, please report it to the Village of Beiseker Office, by calling 403-947-3774!

Thank you very much for you patience.